news
Solution C | Robot/Automation Component Solution

How can we achieve it

Quick change production line: fixture based changeover, program library management, shortening switching time.

Dimensional consistency: Key hole spacing/indexing circle CMM retest, visualization of intra batch/inter batch fluctuations.

Assembly: Provide screw riveting, bearing pressing, positioning pin assembly, and spray code traceability.

DFM collaboration: Participate in manufacturability review before customer drawings, reducing unit costs by 5-15% (experience value).

Deliverables and Metrics

Dimensions: flange, connecting plate, clamping claw, reducer accessories, etc

Accuracy: hole spacing/indexing circle ± 0.01 mm; end face runout ≤ 0.02 mm

Documents: FAI, process inspection records, torque/press fit torque records, barcode traceability

Typical components: robot flange, joint spacer, EOAT fixture, camera bracket, fixture module.

Cycle: 5-7 days for samples | 7-14 days for mass production

CTA: Schedule DFM review and provide a list of cost reduction/quality improvement suggestions within 12 hours.


Let’s Work Together
Send us a message and tell us about your needs, and we’ll be in touch right away.
SEND MESSAGE